TRDizin: CONSTRUCTION, ASSEMBLY AND SYSTEM DEPLOYMENT OF A FISH CAGE WITH COPPER ALLOY MESH PEN: CHALLENGING WORK LOAD AND ESTIMATION OF MAN-POWER
dc.contributor.author | Ümit Acar | |
dc.contributor.author | Ümüt Yiğit | |
dc.contributor.author | Murat Yiğit | |
dc.contributor.author | Judson DeCew | |
dc.contributor.author | Osman S. Kesbiç | |
dc.contributor.author | Evrim Kurtay | |
dc.contributor.author | Barbaros Çelikkol | |
dc.contributor.author | Michael Osienski | |
dc.contributor.author | Mustafa Karga | |
dc.contributor.author | Barış Özalp | |
dc.contributor.author | Nic Taylor | |
dc.contributor.author | Musa Bulut | |
dc.contributor.author | Robert L. Dwyer | |
dc.date.accessioned | 2023-04-14T22:44:07Z | |
dc.date.available | 2023-04-14T22:44:07Z | |
dc.date.issued | 2018-04-01 | |
dc.description.abstract | In the present study, a 150 cubic m net pen was designed as part of a collaborative research effort betweenthe International Copper Association (ICA-USA), the University of New Hampshire (UNH-USA) and Cannakale Onsekiz Mart University (COMU-Turkey) in August 2011. The fish cage was developed to supportthe creation of a small scale demonstration farm, located in the Strait of Canakkale, off the coast of Guzelyalitown in Turkey. The surface gravity-type, octagonal shaped fish cage was designed to have a diameter of 6m and a copper alloy mesh chamber depth of 5 m. The present study details the cage construction and systemdeployment of one fish cage utilized a chain link mesh net chamber with a copper alloy developed by Wieland-Werke in Germany, with reference to work load challenge and estimation of man-power necessary forthe partial and total work efforts. As a conclusion, one cage equipped with copper-alloy mesh pen was broughtto a final shape with the net chamber assembled and attached to the cage frame in 3 days and 90 man-hours.The HDPE (high density polythylene) cage frame was assembled by an outside company, therefore detail ofthe main cage frame is not discussed in this paper. | |
dc.identifier.citation | Acar, Ü., Yi̇ği̇t, Ü., Yi̇ği̇t, M., Decew, J., Kesbi̇ç, O., Kurtay, E., Çeli̇kkol, B., Osi̇enski̇, M., Karga, M., Özalp, B., Taylor, N., Bulut, M., Dwyer, R. (2018). CONSTRUCTION, ASSEMBLY AND SYSTEM DEPLOYMENT OF A FISH CAGE WITH COPPER ALLOY MESH PEN: CHALLENGING WORK LOAD AND ESTIMATION OF MAN-POWER. Aquatic Research, 1(1), 38-49 | |
dc.identifier.doi | 10.3153/AR18005 | |
dc.identifier.eissn | 2618-6365 | |
dc.identifier.endpage | 49 | |
dc.identifier.issn | ||
dc.identifier.issue | 1 | |
dc.identifier.startpage | 38 | |
dc.identifier.trdizin | 365721 | |
dc.identifier.uri | https://search.trdizin.gov.tr/publication/detail/365721/construction-assembly-and-system-deployment-of-a-fish-cage-with-copper-alloy-mesh-pen-challenging-work-load-and-estimation-of-man-power | |
dc.identifier.uri | https://hdl.handle.net/20.500.12597/7664 | |
dc.identifier.volume | 1 | |
dc.language.iso | eng | |
dc.relation.ispartof | Aquatic Research | |
dc.rights | info:eu-repo/semantics/openAccess | |
dc.title | CONSTRUCTION, ASSEMBLY AND SYSTEM DEPLOYMENT OF A FISH CAGE WITH COPPER ALLOY MESH PEN: CHALLENGING WORK LOAD AND ESTIMATION OF MAN-POWER | |
dc.type | RESEARCH | |
dspace.entity.type | Trdizin | |
relation.isPublicationOfTrdizin | 38725625-d4fd-4c6c-b0d7-e9041102cbfe | |
relation.isPublicationOfTrdizin.latestForDiscovery | 38725625-d4fd-4c6c-b0d7-e9041102cbfe |