TRDizin:
CONSTRUCTION, ASSEMBLY AND SYSTEM DEPLOYMENT OF A FISH CAGE WITH COPPER ALLOY MESH PEN: CHALLENGING WORK LOAD AND ESTIMATION OF MAN-POWER

dc.contributor.authorÜmit Acar
dc.contributor.authorÜmüt Yiğit
dc.contributor.authorMurat Yiğit
dc.contributor.authorJudson DeCew
dc.contributor.authorOsman S. Kesbiç
dc.contributor.authorEvrim Kurtay
dc.contributor.authorBarbaros Çelikkol
dc.contributor.authorMichael Osienski
dc.contributor.authorMustafa Karga
dc.contributor.authorBarış Özalp
dc.contributor.authorNic Taylor
dc.contributor.authorMusa Bulut
dc.contributor.authorRobert L. Dwyer
dc.date.accessioned2023-04-14T22:44:07Z
dc.date.available2023-04-14T22:44:07Z
dc.date.issued2018-04-01
dc.description.abstractIn the present study, a 150 cubic m net pen was designed as part of a collaborative research effort betweenthe International Copper Association (ICA-USA), the University of New Hampshire (UNH-USA) and Cannakale Onsekiz Mart University (COMU-Turkey) in August 2011. The fish cage was developed to supportthe creation of a small scale demonstration farm, located in the Strait of Canakkale, off the coast of Guzelyalitown in Turkey. The surface gravity-type, octagonal shaped fish cage was designed to have a diameter of 6m and a copper alloy mesh chamber depth of 5 m. The present study details the cage construction and systemdeployment of one fish cage utilized a chain link mesh net chamber with a copper alloy developed by Wieland-Werke in Germany, with reference to work load challenge and estimation of man-power necessary forthe partial and total work efforts. As a conclusion, one cage equipped with copper-alloy mesh pen was broughtto a final shape with the net chamber assembled and attached to the cage frame in 3 days and 90 man-hours.The HDPE (high density polythylene) cage frame was assembled by an outside company, therefore detail ofthe main cage frame is not discussed in this paper.
dc.identifier.citationAcar, Ü., Yi̇ği̇t, Ü., Yi̇ği̇t, M., Decew, J., Kesbi̇ç, O., Kurtay, E., Çeli̇kkol, B., Osi̇enski̇, M., Karga, M., Özalp, B., Taylor, N., Bulut, M., Dwyer, R. (2018). CONSTRUCTION, ASSEMBLY AND SYSTEM DEPLOYMENT OF A FISH CAGE WITH COPPER ALLOY MESH PEN: CHALLENGING WORK LOAD AND ESTIMATION OF MAN-POWER. Aquatic Research, 1(1), 38-49
dc.identifier.doi10.3153/AR18005
dc.identifier.eissn2618-6365
dc.identifier.endpage49
dc.identifier.issn
dc.identifier.issue1
dc.identifier.startpage38
dc.identifier.trdizin365721
dc.identifier.urihttps://search.trdizin.gov.tr/publication/detail/365721/construction-assembly-and-system-deployment-of-a-fish-cage-with-copper-alloy-mesh-pen-challenging-work-load-and-estimation-of-man-power
dc.identifier.urihttps://hdl.handle.net/20.500.12597/7664
dc.identifier.volume1
dc.language.isoeng
dc.relation.ispartofAquatic Research
dc.rightsinfo:eu-repo/semantics/openAccess
dc.titleCONSTRUCTION, ASSEMBLY AND SYSTEM DEPLOYMENT OF A FISH CAGE WITH COPPER ALLOY MESH PEN: CHALLENGING WORK LOAD AND ESTIMATION OF MAN-POWER
dc.typeRESEARCH
dspace.entity.typeTrdizin
relation.isPublicationOfTrdizin38725625-d4fd-4c6c-b0d7-e9041102cbfe
relation.isPublicationOfTrdizin.latestForDiscovery38725625-d4fd-4c6c-b0d7-e9041102cbfe

Files