Publication:
Particle swarm optimization based approach for estimation of costs and duration of construction projects

dc.contributor.authorKhalaf T.Z., Çağlar H., Çağlar A., Hanoon A.N.
dc.contributor.authorKhalaf, TZ, Caglar, H, Caglar, A, Hanoon, AN
dc.date.accessioned2023-05-09T20:01:04Z
dc.date.available2023-05-09T20:01:04Z
dc.date.issued2020-02-01
dc.date.issued2020.01.01
dc.description.abstractCost and duration estimation is essential for the success of construction projects. The importance of decision making in cost and duration estimation for building design processes points to a need for an estimation tool for both designers and project managers. Particle swarm optimization (PSO), as the tools of soft computing techniques, offer significant potential in this field. This study presents the proposal of an approach to the estimation of construction costs and duration of construction projects, which is based on PSO approach. The general applicability of PSO in the formulated problem with cost and duration estimation is examined. A series of 60 projects collected from constructed government projects were utilized to build the proposed models. Eight input parameters, such as volume of bricks, the volume of concrete, footing type, elevators number, total floors area, area of the ground floor, floors number, and security status are used in building the proposed model. The results displayed that the PSO models can be an alternative approach to evaluate the cost and-or duration of construction projects. The developed model provides high prediction accuracy, with a low mean (0.97 and 0.99) and CoV (10.87% and 4.94%) values. A comparison of the models’ results indicated that predicting with PSO was importantly more precise.
dc.identifier.doi10.28991/cej-2020-03091478
dc.identifier.eissn2476-3055
dc.identifier.endpage401
dc.identifier.issn2676-6957
dc.identifier.scopus2-s2.0-85086871669
dc.identifier.startpage384
dc.identifier.urihttps://hdl.handle.net/20.500.12597/14632
dc.identifier.volume6
dc.identifier.wosWOS:000518413600015
dc.relation.ispartofCivil Engineering Journal (Iran)
dc.relation.ispartofCIVIL ENGINEERING JOURNAL-TEHRAN
dc.rightstrue
dc.subjectConstruction project | Cost | Decision making | Duration | Managing projects | Particle swarm optimization
dc.titleParticle swarm optimization based approach for estimation of costs and duration of construction projects
dc.titleParticle Swarm Optimization Based Approach for Estimation of Costs and Duration of Construction Projects
dc.typeArticle
dspace.entity.typePublication
oaire.citation.issue2
oaire.citation.volume6
relation.isScopusOfPublicationb2ec2396-811e-4630-960b-435021621193
relation.isScopusOfPublication.latestForDiscoveryb2ec2396-811e-4630-960b-435021621193
relation.isWosOfPublicationc5c747e9-e3fc-467e-8ab7-44d4fd83e9e8
relation.isWosOfPublication.latestForDiscoveryc5c747e9-e3fc-467e-8ab7-44d4fd83e9e8

Files

Collections