Publication: CONSTRUCTION, ASSEMBLY AND SYSTEM DEPLOYMENT OF A FISH CAGE WITH COPPER ALLOY MESH PEN: CHALLENGING WORK LOAD AND ESTIMATION OF MAN-POWER
Program
KU Authors
KU-Authors
Co-Authors
Authors
Advisor
Date
Language
Type
Journal Title
Journal ISSN
Volume Title
Abstract
In the present study, a 150 cubic m net pen was designed as part of a collaborative research effort betweenthe International Copper Association (ICA-USA), the University of New Hampshire (UNH-USA) and Cannakale Onsekiz Mart University (COMU-Turkey) in August 2011. The fish cage was developed to supportthe creation of a small scale demonstration farm, located in the Strait of Canakkale, off the coast of Guzelyalitown in Turkey. The surface gravity-type, octagonal shaped fish cage was designed to have a diameter of 6m and a copper alloy mesh chamber depth of 5 m. The present study details the cage construction and systemdeployment of one fish cage utilized a chain link mesh net chamber with a copper alloy developed by Wieland-Werke in Germany, with reference to work load challenge and estimation of man-power necessary forthe partial and total work efforts. As a conclusion, one cage equipped with copper-alloy mesh pen was broughtto a final shape with the net chamber assembled and attached to the cage frame in 3 days and 90 man-hours.The HDPE (high density polythylene) cage frame was assembled by an outside company, therefore detail ofthe main cage frame is not discussed in this paper.
Description
Source:
Publisher:
Keywords:
Keywords
Citation
Acar, Ü., Yi̇ği̇t, Ü., Yi̇ği̇t, M., Decew, J., Kesbi̇ç, O., Kurtay, E., Çeli̇kkol, B., Osi̇enski̇, M., Karga, M., Özalp, B., Taylor, N., Bulut, M., Dwyer, R. (2018). CONSTRUCTION, ASSEMBLY AND SYSTEM DEPLOYMENT OF A FISH CAGE WITH COPPER ALLOY MESH PEN: CHALLENGING WORK LOAD AND ESTIMATION OF MAN-POWER. Aquatic Research, 1(1), 38-49
