Yayın:
A Provisional Study of ADS Within Turkic Accelerator Complex Project

dc.contributor.authorArik, M.
dc.contributor.authorBilgin, P. S.
dc.contributor.authorCaliskan, A.
dc.contributor.authorCetiner, M. A.
dc.contributor.authorSultansoy, S.
dc.date.accessioned2026-01-02T20:04:57Z
dc.date.issued2012-01-01
dc.description.abstractThe Turkic Accelerator Complex (TAC) project has been developed with the support of the Turkish State Planning Organization by the collaboration of 10 Turkish universities. The complex is planned to have four main facilities, namely: SASE FEL Facility Based on 1 GeV Electron Linac, Third Generation Synchrotron Radiation Facility (SR) Based on 3.56 GeV Positron Synchrotron, Super-Charm Factory ($\sqrt{s} = 3.77$ GeV) by colliding the electron beam coming from the linac with an energy of 1 GeV and positron beam coming through the positron ring with an energy of 3.56 GeV, GeV scale proton accelerator. Later has two-fold goal: Neutron Spallation Source (NSS) and ADS. The proton accelerator construction will have 3 MeV, 100 MeV, and 1 GeV phases. The technical design report is planned to be finished in 2013. Since Turkey has essential Thorium reserves the ADS becomes very attractive for our country as emerging energy technology.
dc.description.abstract4 pages, 3 figures, 1 table, NuRER 2012 - III. International Conference on Nuclear & Renewable Energy Resources, Istanbul, TURKEY, 20-23 May 2012
dc.description.urihttps://dx.doi.org/10.48550/arxiv.1206.4957
dc.description.urihttp://arxiv.org/abs/1206.4957
dc.identifier.doi10.48550/arxiv.1206.4957
dc.identifier.openairedoi_dedup___::b83a6affb077500ebaaff428b83ddbab
dc.identifier.urihttps://hdl.handle.net/20.500.12597/35565
dc.publisherarXiv
dc.rightsOPEN
dc.subjectAccelerator Physics (physics.acc-ph)
dc.subjectFOS: Physical sciences
dc.subjectPhysics - Accelerator Physics
dc.subject.sdg7. Clean energy
dc.titleA Provisional Study of ADS Within Turkic Accelerator Complex Project
dc.typeArticle
dspace.entity.typePublication
local.api.response{"authors":[{"fullName":"Arik, M.","name":"M.","surname":"Arik","rank":1,"pid":null},{"fullName":"Bilgin, P. S.","name":"P. S.","surname":"Bilgin","rank":2,"pid":null},{"fullName":"Caliskan, A.","name":"A.","surname":"Caliskan","rank":3,"pid":null},{"fullName":"Cetiner, M. A.","name":"M. A.","surname":"Cetiner","rank":4,"pid":null},{"fullName":"Sultansoy, S.","name":"S.","surname":"Sultansoy","rank":5,"pid":null}],"openAccessColor":null,"publiclyFunded":false,"type":"publication","language":{"code":"und","label":"Undetermined"},"countries":null,"subjects":[{"subject":{"scheme":"keyword","value":"Accelerator Physics (physics.acc-ph)"},"provenance":null},{"subject":{"scheme":"FOS","value":"0202 electrical engineering, electronic engineering, information engineering"},"provenance":null},{"subject":{"scheme":"keyword","value":"FOS: Physical sciences"},"provenance":null},{"subject":{"scheme":"keyword","value":"Physics - Accelerator Physics"},"provenance":null},{"subject":{"scheme":"FOS","value":"02 engineering and technology"},"provenance":null},{"subject":{"scheme":"FOS","value":"01 natural sciences"},"provenance":null},{"subject":{"scheme":"SDG","value":"7. Clean energy"},"provenance":null},{"subject":{"scheme":"FOS","value":"0104 chemical sciences"},"provenance":null}],"mainTitle":"A Provisional Study of ADS Within Turkic Accelerator Complex Project","subTitle":null,"descriptions":["The Turkic Accelerator Complex (TAC) project has been developed with the support of the Turkish State Planning Organization by the collaboration of 10 Turkish universities. The complex is planned to have four main facilities, namely: SASE FEL Facility Based on 1 GeV Electron Linac, Third Generation Synchrotron Radiation Facility (SR) Based on 3.56 GeV Positron Synchrotron, Super-Charm Factory ($\\sqrt{s} = 3.77$ GeV) by colliding the electron beam coming from the linac with an energy of 1 GeV and positron beam coming through the positron ring with an energy of 3.56 GeV, GeV scale proton accelerator. Later has two-fold goal: Neutron Spallation Source (NSS) and ADS. The proton accelerator construction will have 3 MeV, 100 MeV, and 1 GeV phases. The technical design report is planned to be finished in 2013. Since Turkey has essential Thorium reserves the ADS becomes very attractive for our country as emerging energy technology.","4 pages, 3 figures, 1 table, NuRER 2012 - III. International Conference on Nuclear & Renewable Energy Resources, Istanbul, TURKEY, 20-23 May 2012"],"publicationDate":"2012-01-01","publisher":"arXiv","embargoEndDate":"2012-01-01","sources":null,"formats":null,"contributors":null,"coverages":null,"bestAccessRight":{"code":"c_abf2","label":"OPEN","scheme":"http://vocabularies.coar-repositories.org/documentation/access_rights/"},"container":null,"documentationUrls":null,"codeRepositoryUrl":null,"programmingLanguage":null,"contactPeople":null,"contactGroups":null,"tools":null,"size":null,"version":null,"geoLocations":null,"id":"doi_dedup___::b83a6affb077500ebaaff428b83ddbab","originalIds":["50|datacite____::b83a6affb077500ebaaff428b83ddbab","10.48550/arxiv.1206.4957","oai:arXiv.org:1206.4957","50|od________18::b24a81aa869af5e996b614ac232e6d16"],"pids":[{"scheme":"doi","value":"10.48550/arxiv.1206.4957"},{"scheme":"arXiv","value":"1206.4957"}],"dateOfCollection":null,"lastUpdateTimeStamp":null,"indicators":{"citationImpact":{"citationCount":0,"influence":2.5349236e-9,"popularity":5.4374694e-10,"impulse":0,"citationClass":"C5","influenceClass":"C5","impulseClass":"C5","popularityClass":"C5"}},"instances":[{"pids":[{"scheme":"doi","value":"10.48550/arxiv.1206.4957"}],"license":"arXiv Non-Exclusive Distribution","type":"Article","urls":["https://dx.doi.org/10.48550/arxiv.1206.4957"],"publicationDate":"2012-01-01","refereed":"nonPeerReviewed"},{"pids":[{"scheme":"arXiv","value":"1206.4957"}],"type":"Preprint","urls":["http://arxiv.org/abs/1206.4957"],"publicationDate":"2012-06-20","refereed":"nonPeerReviewed"}],"isGreen":true,"isInDiamondJournal":false}
local.import.sourceOpenAire

Dosyalar

Koleksiyonlar